The soda filling machine(Aluminum can )is consist of filling,capping part.Can filling,capping can be carried out on the same machine.
Model | 12-4 | 18-6 | 24-6 | 36-6 |
---|---|---|---|---|
Production capacity (Cans per hour) | 4000 | 7000 | 10000 | 15000 |
Applicable bottle | Aluminum can | |||
Filling pressure | 0.4mpa | |||
Filling temperature | 2-6℃ | |||
Total power | 5.5 | 7.5 | 7.5 | 10 |
Weight(KG) | 3000 | 4000 | 5000 | 6000 |
Soft Drink Filling Machine (Aluminum can )is consist of filling,capping part.Can filling,capping can be carried out on the same machine.The machine is suitable for carbonated beverage such as beer, carbonated soft drink, energy drink, etc. It is equipped the advanced device, electrical equipment, and pneumatic control technology.
1,It has the characteristics of high speed, liquid level control, cap seaming reliably, frequency conversion timing, no liquid split out. It can be equipped long-distance control system.
2,As the can is easy to get deformed, soft handleling is needed in the transferring process. The conveying system regulates the transferring speed according to the each machine’s working condition to assure no bottle falling or crashing, it remains a steady smooth running speed.
3,Liquid tank, filling valve and filling all parts and touch material parts, are made of food grade stainless steel 304, and all interfaces are sealed with a ventilated pipe, and all sensor interfaces on the jar are made of butterfly valves. Not only has good corrosion resistance, and easy to clean
Soft Drink Canning Filling Machine is suitable for carbonated beverage such as beer, carbonated soft drink, energy drink, etc. It is equipped the advanced device, electrical equipment, and pneumatic control technology.
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.
Fill in your details and we’ll get back to you in no time.