carbonated soft drink filling machine is consisted of Washing,filling,capping part.Bottle Washing,filling,capping can be carried out on the same machine. The design of the machine is scientific and reasonable.It is a fully automatic and high efficiency carbonated drink filling machine.
Model | DCGF60-60-12 |
---|---|
Capacity (B/H) | 10000BPH (1500ml) |
Bottle size | Neck :φ50-100mm:Height:150-320mm |
Water Pressure | 0.25-0.4Mpa |
Water consumption(kg/h) | 4000 |
Filling precision | <+5MM |
Air pressure | 0.5Mpa |
Air consumption | 0.3m3/min |
Power(kw) | 13 |
Weight(KG) | 12000 |
Carbonated soft drink filling machine is consisted of Washing,filling,capping part.Bottle Washing,filling,capping can be carried out on the same machine. The design of the machine is scientific and reasonable.It is a fully automatic and high efficiency carbonated drink filling machine.
It’s producing all kinds of soda drink, carbonated drink contained with PET bottle. The design of the machine is scientific and resonable.
It has some features as following:The carbonated soft drink filling machine adopts advanced technology and NanJing valves, with high filling precision.The speed of filling is fast and the liquid amount is controlled accurately,with same filling level.
The carbonated soft drink filling machine is controlled by PLC with touch-screen as the interface between human and machine.The amount of the drinks in the drink tank can be controlled automatically.The filling and capping will be stopped automatically when there is no bottle.When bottles are cramped wrongly or caps are not available,the machine can be stopped automatically.
1.The series soft drink manufacturing plant is made as our customer’s need, high filling speed for carbonated gas drink, sharing one machine with several PET bottles. It’s used in producing all kinds of soda drink, soft drink, carbonated drink, gas drink contained in PET bottle. It adopts the balanced pressure filling technology.
2. Washing,filling,capping can be carried out on the same machine. The design of the machine is scientific and reasonable.
3. The soft drink manufacturing plant appearance is beautiful and the function is complete. The operation and maintenance is convenient.
4. The soft drink manufacturing plant filling device can be stopped automatically when there is no bottle or bottles are damaged.
5. Pneumatic value and damped gears are used for bottle conveying, the noise is low and the whole machine runs smoothly.
6. The magnetic torque is used for screw capping.The power of screw capping can be adjusted without steps.The power of the screw capping can also be fixed.The caps can not be damaged,the capping is reliable.
7. Horizon swirl air power caps sorting device is used to avoid damaging the surface of caps,and when there is a shortage of caps in the caps storage tank,an alarm signal will be generated and the caps will be fed automatically.
1,PET Bottle Carbonated Drink Filling Machine adopts advanced technology and NanJing valves, with high filling precision.The speed of filling is fast and the liquid amount is controlled accurately,with same filling level.
2,The PET Bottle Carbonated Drink Filling Machine is controlled by PLC with touch-screen as the interface between human and machine.
3,The carbonated soft drink filling machine is controlled by PLC with touch-screen as the interface between human and machine.The amount of the drinks in the drink tank can be controlled automatically.The filling and capping will be stopped automatically when there is no bottle.When bottles are cramped wrongly or caps are not available,the machine can be stopped automatically.
PET Bottle Carbonated Drink Filling Machine is designed for all kinds of soda drink, carbonated drink contained with PET bottle. The design of the machine is scientific and resonable.
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.
Fill in your details and we’ll get back to you in no time.