NEW CROWN

Monoblock 5 in 1 Juice Washing Filling Capping Machine for Glass Bottle with Aluminum Screw Cap

The filling machine is mainly designed for filling hot temperature liquid into glass bottle;

Product Gallery

Product Video

Technical Specifications

Model:RCGF12-12-4RCGF18-18-6RCGF24-24-8RCGF32-32-10RCGF40-40-12RCGF50-50-15RCGF60-60-15
Capacity:

B/H (500ml)
3000-40007000-800010000-1200012000-1500015000-1800020000-2200022000-25000
Bottle shape:Normal round or square
Filling liquidJuice with fruit piece
PET bottle:

(mm)
(Bottle Diameter): φ50-φ110mm (Height): 150-310mm

Volume: 250ml -2000ml
Cap:Plastic screw cap
Filling precision:≤ ±5mm
Return system
High position tank: 1 set; return tank: 1 set; vacuum pump: 1 set; booster pump: 1 set
MaterialStainless steel 304; touch part: 316
Power(KW)3.04.04.25.26.27.58.5
Gas source pressure:6 bar
Rinsing pressure:2-2.5 bar
Overall size:(mm)1900*1500*23502250*1650*23502600*1965*23502980*2200*22503880*2200*22504000*2250*22505500*3500*2250
Weight:

(KG)
25003500450065008500980012000
PLCMitsubishi / Siemens
Touch screenMitsubishi / Siemens
ContactorSchneider
RelySchneider
TransducerShilin / Mitsubishi / Panasonic
Light sensorAutonics
PowerMingwei
Pneumatic partsAirtac / Festo
Stainless steelZPSS
MotorDomestic brand / Siemens / ABB
BearingDomestic brand / NSK

Description

Product Description:

Glass Bottle (Metal Cap) Juice Filling Machine is mainly designed for filling hot temperature liquid into glass bottle; For example juice, tea drinks etc which are made of concentrate juice. The final filling temperature will be around 85-90 degree centigrade; Once the thermal meter in juice filling machine is lower than the temperature, juice will be return to sterilizing machine again through return system. Glass bottle juice filling machine is different from plastic bottle. It will be optional and suggested to apply 4 in 1 filling machine, one more washing system is adopted to warm up the glass bottle in advance.

Features:

– The machine is 3 in 1 or 4 in 1 or 5 in 1 filling machine, including bottle (two step rinsing) rinsing, juice filling and bottle capping;

– Filling machine can be adjusted the height automatically basing on different height of bottles;

– It’s better to adopt same diameters of glass bottle;

– NOTE the touch screen will be apply “Pro-Face”, it can be remote control under internet condition; Once machine program down, we can modify in our factory;

– Same as plastic bottle filling machine. There is return system, including high position tank, return tank, vacuum pump and pump; For return juice to sterilizing machine;

– Except the juice, such filling machine can be used for filling water as well;

– The whole machine structure (all inside parts and outside structure) is totally new designed;

– There is central device for glass bottle while filling;

– Sanitary filling head system is of umbrella structure, high filling speed and perfect filling temperature control system and reflux tank system has the function of supplying the material automatically;

– More function can be added basing on requirement;

– High speed performance with less filling head;

– All the spare parts are made in one piece, which will be easy to change;

– Aluminum screw cap: Vibration cap sorters will be applied to this filling machine;

Application:

Glass Bottle (Metal Cap) Juice Filling Machine is mainly designed for filling hot temperature liquid into glass bottle; For example juice, tea drinks etc which are made of concentrate juice. The final filling temperature will be around 85-90 degree centigrade; Once the thermal meter in juice filling machine is lower than the temperature, juice will be return to sterilizing machine again through return system.

Packaging & Delivery:

All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.

FAQ:

1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .

2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT

4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON

Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.

Request A Quote

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Keep in touch

Fill in your details and we’ll get back to you in no time.