This carbonated drink mixer is designed and made for improving the proportion of water, syrup and carbon dioxide.
Model | QHS-1000 | QHS-2000 | QHS-3000 | QHS-4000 |
---|---|---|---|---|
Production Capacity(kg/h) | 1000 | 2000 | 3000 | 4000 |
Mixing production scale (water:sugar) | 3:1-6:1 | 3:1-6:1 | 3:1-6:1 | 3:1-6:1 |
content of carbon dioxide | 2.5-3.5 | 2.5-3.5 | 2.5-3.5 | 2.5-3.5 |
Mixing temperature | <4 | <4 | <4 | <4 |
power consumption (kw) | 4 | 4.5 | 6 | 7.5 |
Five Tank Drink Mixer is designed and made for improving the proportion of water, syrup and carbon dioxide.It has three tanks :syrup tank,water tank,degassing tank,Premixed tank and mixing tank.The mixer is advanced in technology, even in mixing, reliable performance, compact structure, easy operation.It is suitable for aerated beverage firm of large, middle or small scale.
This carbonated drink mixer is designed and made for improving the proportion of water, syrup and carbon dioxide.
It has following characteristics:
1) This mixer adopts advanced gas-liquid mixing device, can mix syrup, water and CO2 gas at the same time for filling machine.
2) Also it can apply to thin beer, aerate for beer and producing sparkling wine.
3) This mixer is advanced in technology, even in mixing, reliable performance, compact structure, easy operation.
4) It is suitable for aerated beverage firm of large, middle or small scale.
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.
Fill in your details and we’ll get back to you in no time.