CIP cleaning system is used for items in-place cleaning of pipes, valves and vessels, can also apply to the brewery, beverage plants, and general food production materials of pipes and equipment cleaning. Normally it mainly contains three tanks, hot acid water tank, hot alkali water tank and hot water tank separately.

Product Gallery

Product Video

Technical Specifications

Capacity1000LPH
MaterialStainless steel 304
Working pressureNormal pressure in tank, in steam pipe 0.3-0.7Mpa
Working temperatureA: In acid, alkaline and water tank 0-85℃
B: Water pipe normal pressure
Material nameAcid and alkaline liquid tank 2% tric acid solution .2% caustic liquid
Total volumeAcid and alkaline liquid tank; 2×1Ma
Filling coefficient80%
Capacity categoriesAtmospheric Tank
Each cleaning timeFree
The order of cleaning fluidHot water – hot acid water – hot water – hot alkaline water – hot water
Maximal centrifugal pressure head24m
Motor power2.2kw
Weight700kg
Size5000*1500*2500mm
Tank sizeTank diameter: 1250mm
Total height: 2000mm
Outside layer thickness: 2mm
Inside layer thicknedd: 2mm
Insulation layer: 50mm
Material: stainless steel 304
Dosing pump: 60w * 2pcs = 120w
Beverage pump power: 3kw

Description

Product Description:

CIP cleaning system is used for items in-place cleaning of pipes, valves and vessels, can also apply to the brewery, beverage plants, and general food production materials of pipes and equipment cleaning. Normally it mainly contains three tanks, hot acid water tank, hot alkali water tank and hot water tank separately.

A beverage pump which can bear hot temperature is used in CIP to convey cleaning liquid into material pipe and equipment, circulate to equipment circularly. Therefore, the equipment utilization can be improved without the disintegration of the equipment and the pipeline, and reduce labor intensity of workers. Therefore, this product is an advanced of cleaning process equipment.

Advantages:

A beverage pump in CIP cleaning system which can bear hot temperature is used in CIP to convey cleaning liquid into material pipe and equipment, circulate to equipment circularly. Therefore, the equipment utilization can be improved without the disintegration of the equipment and the pipeline, and reduce labor intensity of workers. Therefore, this product is an advanced of cleaning process equipment.

Working principle

A water cleaning

When the material is finished, use water to clean immediately to eliminate residual material, at the same time it is more advantageous to the next step of liquid water cleaning. water can stop when the equipment flow of water out of clearing.

B Alkali-cleaning

The NaOH makes up to 2% concentration alkaline twist in the holding tank, heated to 80 ℃, then cycling about 30minutes. The alkali can dissolve protein, butterfat and make the fouling loose foam. If the scale is more serious, it can increase the concentration of the solution.

C Water cleaning

Use water to flush about 15 minutes after remove the alkali.

D Acid-cleaning

Make the HNO3 into the concentration of 2% acidic detergent, then heat to 80℃, cycling about 30minutes.

E Water cleaning

Use water to flush about 15 minutes after remove the acid, in case of the materials are polluted during reproduction.

Applications:

CIP cleaning system is used for items in-place cleaning of pipes, valves and vessels, can also apply to the brewery, beverage plants, and general food production materials of pipes and equipment cleaning.

Packaging & Delivery:

All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.

FAQ:

1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .

2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT

4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON

Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.

Request A Quote

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Keep in touch

Fill in your details and we’ll get back to you in no time.