NEW CROWN

Beer Pasteurizer Tunnel

Beer pasteurizer tunnel is used for bottled/canned beer pasteurizing.

Product Gallery

Product Video

Technical Specifications

Zone1
5-25°
Zone2
25-50°
Zone3
50-70°
Zone4
85°
Zone5
85-60°
Zone7
45-25°
Plate heat exchanger1Plate heat exchanger2Plate heat exchanger3Plate heat exchanger4Plate heat exchanger5

Description

Product Description:

Beer pasteurizer tunnel is used for bottled/canned beer pasteurizing.
The principle is: Conveyor brings bottles/cans into the cooling tunnel, there will be hot/cold water generated from side holding tanks to spray by spray nozzles on the top of tunnel onto passing bottles.
With heat exchange principle, the bottles/cans temperature will be bring up to high temperature to pasteurize the virus inside vessel, the bring down again by cold water to normal room temperature to keep longer shelf life.

Advantages:

The principle is: Conveyor brings bottles/cans into the cooling tunnel, there will be hot/cold water generated from side holding tanks to spray by spray nozzles on the top of tunnel onto passing bottles.

With heat exchange principle, the bottles/cans temperature will be bring up to high temperature to pasteurize the virus inside vessel, the bring down again by cold water to normal room temperature to keep longer shelf life.

Application:

Beer pasteurizer tunnel is used for bottled/canned beer pasteurizing.

Packaging & Delivery:

All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.

FAQ:

1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .

2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT

4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON

Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.

Request A Quote

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Keep in touch

Fill in your details and we’ll get back to you in no time.