NEW CROWN

Automatic Bottle Crown Capper

The automatic bottle crown capper is designed for sealing glass bottle with crown cap, press cap.

Product Gallery

Product Video

Technical Specifications

ModelYG-6
Production Capacity3000-4000B/H
Capping head6 heads
MaterialSUS304
Diameter of bottle40-100mm
Height of bottle60-320mm
SpeedFixed speed
Power0.75kw
Overall Dimensions1000*900*1850mm
Weight400kg

Description

Product Description:

Automatic Bottle Crown Capper is designed for sealing glass bottle with crown cap, press cap. It is designed with single sealing head. It has the automatic function of cap sorter, cap loader and cap pressing sealing. The machine is full automatic. It adopts the high quality of stainless steel 304 material, meets the requirements of food grade. It is perfect in performance, reliable in operation and easy in maintenance. It could be used single or connected with the production line. So it is widely used in automatic packing lines for various kinds of milk, juice, wine, drink, pharmacy chemicals, reagent, pesticide and so on. It is one of the most ideal automatic sealing equipment.

Main components:

Machine transmission system: motor, main wheel, worm fear, limited cam

Cap capping system: Cap sorter and loader, sealing wheel, cap pressing head, compression springs.

Machine frame, electric control system, switch, conveyor system

Advantage:

It has the automatic function of cap sorter, cap loader and cap pressing sealing.

The machine is full automatic. It adopts the high quality of stainless steel 304 material, meets the requirements of food grade.

It is perfect in performance, reliable in operation and easy in maintenance.

Application:

Automatic Bottle Crown Capper is designed for sealing glass bottle with crown cap, press cap.

Packaging & Delivery:

All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.

FAQ:

1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .

2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT

4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON

Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.

Request A Quote

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Keep in touch

Fill in your details and we’ll get back to you in no time.