Water bottling machine integrates washing machine, filling machine and capping machine in one frame. The water bottling machine driving system will be transmitted step by step which makes the speed more stable.
Model | CGF12-12-4 | CGF18-18-6 |
---|---|---|
Capacity | 1000BPH | 2000BPH |
Applicable bottle | Plastic bottle 5L-10L Plastic screw cap |
|
Applicable filling content | Mineral water, wine, non-carbonated water | |
Washing station | 12 | 18 |
Filling nozzle | 12 | 18 |
Capping head | 4 | 6 |
Main motor power | 3.5kw | 5.5kw |
Water pump power | 0.37kw | |
Dimension (mm) | 2500*2100*2450 | 3200*2500*2450 |
Weight (kg) | 4000 | 5000 |
5-10L bottle filling machine is mainly applied for the filling of beverage. Integrating with washing, filling and sealing, it realizes full automation in the whole process, suitable for polyester bottle and plastic bottle filling of mineral water and purified water. The bottle types applicable for various parts are easily, conveniently and rapidly adjustable. It adopts new micro-negative pressure filling, stable and reliable. Compared with the machines of the same specification, the benefit of this machine is larger.
5-10L big bottle water filling machine is a monoblock machine, Monoblock means the filling machine integrates washing machine, filling machine and capping machine in one frame. The driving system will be transmitted step by step which makes the speed more stable.
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.
Fill in your details and we’ll get back to you in no time.