NEW CROWN

3 in 1 Bottle Washing Filling Capping Machine

Bottle washing filling capping machine
1. Filling drink: Energy drink, carbonated drink, soft drink
2. Filling capacity: 5000-6000BPH 500ml
3. Filling pressure: Balanced pressure
4. Applicable bottle: Plastic bottle with screw cap
5. Automatic grade: Full automatic

Product Gallery

Product Video

Technical Specifications

ModelDCGF18-18-6
Capacity5000-6000BPH 500ml
Bottle standard200-2000ml with same bottle diameter
Bottle washing position 18
Bottle filling position 18
Bottle capping position6
Bottle washing consumption 300-500kg/h
Water pressure of bottle washing0.18-0.25Mpa
Gas source pressure0.4Mpa
Filling pressure0.4Mpa
Filing precision+5MM
Material Stainless Steel SUS304
Autoamtic control systerm PLC touch screen
Gas consumption(m³/min)0.8
Total power4kw
Weight 3000kg
Size 2430*1800*2250MM

Description

Product Description:

The 3 in 1 bottle washing filling capping machine for energy drink is used in producing all kinds of soda drink, soft drink, carbonated drink, gas drink contained in PET bottle with screw cap.

Advantages:

1,The water filling machine is controlled by PLC with touch-screen as the interface between human and machine.

2,The amount of the drinks in the drink tank can be controlled automatically.

3,The filling and capping will be stopped automatically when there is no bottle.

4,When bottles are cramped wrongly or caps are not avaliable, the machine can be stopped automatically.

5,Horizon swirl air power caps sorting device is used to avoid damagining the surface of caps,and when there is a shortage of caps in the caps storage tank,an alarm signal will be generated and the caps will be fed automatically.

Application:

The 3 in 1 bottle washing filling capping machine for energy drink is used in producing all kinds of soda drink, soft drink, carbonated drink, gas drink contained in PET bottle with screw cap.

Packaging & Delivery:

All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.

FAQ:

1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .

2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT

4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON

Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.

Request A Quote

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Keep in touch

Fill in your details and we’ll get back to you in no time.