BGF serious beer bottling machine is suitable for glass bottle beer filling, caps can be crown cap or easy open cap. it can also apply to plastic bottle with plastic screw caps.
Model | Production capacity | Rinsing heads | Filling heads | Pull Ring Capping heads | Bottle size | Main motor power (KW) | |
---|---|---|---|---|---|---|---|
Diameter (mm) | Height (mm) | ||||||
BCGF 12-12-4 | 1500 | 12 | 12 | 4 | 30-90 | 100-320 | 2.2 |
BCGF 18-18-6 | 2500 | 18 | 18 | 6 | 30-90 | 100-320 | 3 |
BCGF 24-24-8 | 4000 | 24 | 24 | 8 | 30-90 | 100-320 | 4 |
BCGF 32-32-10 | 6500 | 32 | 32 | 10 | 30-90 | 100-320 | 5 |
BCGF 40-40-12 | 8500 | 40 | 40 | 12 | 30-90 | 100-320 | 6.5 |
BCGF 60-60-12 | 12000-15000 | 60 | 60 | 15 | 30-90 | 100-320 | 7.5 |
Model | BGF8-8-3 | BGF12-12-4 | BGF18-18-6 | BGF24-24-8 | BGF32-32-10 | BGF40-40-12 |
---|---|---|---|---|---|---|
Capacity 500ml | 800-1000BPH | 1500-2000BPH | 2500-3000BPH | 5000-6000BPH | 8000-9000BPH | 10000-12000BPH |
Aluminum Bottle Beer Filling Machine is designed for all types of beer, both still and sparkling, alcholic or none-alcholic. some are suitable to fill in glass bottle, some are suitable for plastic bottle, others are rather suitable in cans. We also supply beer filling machine for cans and easy cap type if you’re interested, along with other beer machine, such as brewery tanks.
The glass bottle is firstly pressed on and then undergoes double pre-evacuation and double CO2 inflation. Once the pressure is the same in the ring bowl and in the bottle, the filling process commences. Once the liquid level reaches the end of the vent tube, no more gas can escape from the bottle – and the filling valve is closed. After a settling phase, the snifting valve lowers the pressure in the bottle’s head space and the filled bottle leaves the machine.
Characteristics
■ Reliable calculation of the fill level using the length of the vent tube
■ No residual liquid can enter the empty bottles during pressurisation. Unwanted foaming and hygiene risks during filling are thus no longer an issue.
■ Closed CIP circuit
■ Hygienic design
■ Electro-pneumatically controlled filling valve functions
Output Up to 30,000 containers per hour
1. Using the conveyor sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier.
2. Bottles transmission adopt clip bottle neck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough.
3. The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution.
4. High-speed balanced pressure flow valve filling valve, filling fast, filling accurate and no liquid spit out.
5. Spiraling decline when output bottle, transform bottle shape no need to adjust the height of conveyor chains.
6. Host adopt advanced PLC automatic control technology, the key electrical components from famous company such as Japan’s Mitsubishi, France Schneider, OMRON or ABB.
7. The CIP cleaning solution gets in contact with every part and interstice of the valves.
8. With Central greasing system.
9. Replacement valves are adopted. The complete filling process will be as below:
①, The replacement valve is linking with air drum, CO2 inside air drum enter bottles via replacement valve. The gas inside bottle now is mixing with CO2 and air.
②, Air exhausting valve is opened via cam to exhaust the mixed gas.
③, Refill CO2 into bottle again.
④, Operation valve open, after the pressure between cylinder and bottle is equal, the filling process starts, when the filling level reach air returning pipe, filling stops, filling valves closed.
⑤, After filling process finishing, before filling valves leaving bottles, air exhausting valve exhaust extra gas, then filling valves leave bottle neck, filling process finishes.
Beer Bottling Machine Wash-filling-capping 3-in-1unit is used to produce glass bottled beer. The BCGF series of 3 in 1 monobloc rinisng, vacuum filling, capping machine adopts advanced technologies of double evacuations before filling and high pressure hot water injection system after Beer filling.
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.