Our edible cooking oil plastic bottle filling machine uses pressure filling, which is suitable for all lower density liquid, such as edible cooking oil, olive oil,etc.
PLC | Mitsubishi Japan | 1pc |
---|---|---|
Contactor | Schneider Germany | 1pc |
Air switch | Schneider Germany | 1pc |
Schneider Germany | 1pc | |
stabilized voltage supply | MingWei TaiWan | 1pc |
Photo electricity | Autonics Korea | 1pc |
Touch screen | Easyview Taiwan | 1pc |
Oil filling machine uses pressure filling, which is suitable for all lower density liquid, such as edible cooking oil, olive oil,etc. Combined with air dust cleaning, oil filling, plastic screw capping. For plastic bottles from 500ml-5L, if you need to fill in same machine, must keep same bottle neck diameter. Our speed various from 2000-15000BPH based on 1L bottle. You can choose monoblock 3 in 1 or monoblock 2 in 1 combination, with or without air/water dust cleaning. Also we offer lower speed of linear type filler and capper. Complete machine is be controlled by PLC touch screen, all settings can be adjusted on screen, not only the filling volume, also the filling speed.
The whole machine is stable and energy saving.
Complete machine is be controlled by PLC touch screen,
all settings can be adjusted on screen, not only the filling volume, also the filling speed.
Oil filling machine uses pressure filling, which is suitable for all lower density liquid, such as edible cooking oil, olive oil,etc.
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.
Fill in your details and we’ll get back to you in no time.