Automatic weight filling machine can be applied to big HDPE/PET bottles from 5L to 20L. inlet and out all using belt conveyor, stainless steel or plastic belt. With PLC touch screen control, you can realize real easy parameter control. Can apply to both high and low density liquid.
PLC | Mitsubishi Japan | 1pc |
---|---|---|
Contactor | Schneider Germany | 1pc |
Air switch | Schneider Germany | 1pc |
Schneider Germany | 1pc | |
stabilized voltage supply | MingWei TaiWan | 1pc |
Photo electricity | Autonics Korea | 1pc |
Touch screen | Easyview Taiwan | 1pc |
5-20L Automatic Weight oil Filling Machine for PET bottles can be applied to big HDPE/PET bottles from 5L to 20L. inlet and out all using belt conveyor, stainless steel or plastic belt. With PLC touch screen control, you can realize real easy parameter control. Can apply to both high and low density liquid. Our speed various from 100 bottle to 5000 bottle per hour. Different bottle can share same filling machine by only changing few parts, which gives client more options for market. All machine main part can be designed to SUS316 or better steel type for anti-corrosion use. Easy operation is another advantage for less training easier start for clients.
Complete machine is be controlled by PLC touch screen, all settings can be adjusted on screen, not only the filling volume, also the filling speed.
Automatic weight filling machine can be applied to big HDPE/PET bottles from 5L to 20L. inlet and out all using belt conveyor, stainless steel or plastic belt.
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.
Fill in your details and we’ll get back to you in no time.