Complete drinking water filling machine is used to treat raw water to mineral water or pure water to be drinkable for bottle filling.
Item | Description | Material | Filter element | Function |
---|---|---|---|---|
Booster pump | SUS304 | / | To pump raw water into pre-treatment tanks | |
Quartz sand filter | SUS304 | Coarse sand Medium sand Fine sand | To remove metal and large particle in water | |
Active carbon filter | SUS304 | Quartz sand Active carbon | To absorb color and foreign smell in water | |
Water softener | SUS304 | Anion Cation | To reduce the water hardness in water | |
Ion rebirth device | ABS tank | Salin water | To clean the ion in water softener to realize recycling | |
Cartridge filter | SUS304 | PP film | To filter the water before entering reverse osmosis and protect the RO membrane | |
Reverse osmosis | SUS304 FRP | 8040/4040 membrane | To reduce the salt in water | |
UV sterilizer | SUS304 | UV lamp | To kill the bacteria in water | |
Pure water storage | SUS304 | / | To store pure water | |
Ozone machine | / | Ozone generator | To kill the bacteria in water |
Complete drinking water filling machine is used to treat raw water to mineral water or pure water to be drinkable for bottle filling.
Raw water can be city water, well water, lake water, spring water, part river water etc. Pre-treatment: booster pump, quartz sand filter, active carbon filter, water softener, ion rebirth device, cartridge filter.
After treatment: reverse osmosis, Anti-scale system, UV sterilizer, pure water storage tank, ozone machine
Complete Drinking Water Filling Machine is a monoblock machine, Monoblock means the filling machine integrates washing machine, filling machine and capping machine in one frame. The driving system will be transmitted step by step which makes the speed more stable.
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.
Fill in your details and we’ll get back to you in no time.