bottle cap sealer
1. Capacity: 0-2000BPH
2. Suitable cap: Plastic bottle with screw cap
3. Capping head: 1 head
4. Main material: SUS304
Model : | FXZ-1 |
---|---|
Production Capacity : | 1000-2000b/h |
Capping head | 1 head |
Diameter of bottle: | 40-100 mm |
Height of bottle : | 80-320 mm |
Power : | 0.75kw |
Overall Dimensions : | 1000×900×1800mm |
Weight : | 350kg |
bottle cap sealer
1. Capacity: 0-2000BPH
2. Suitable cap: Plastic bottle with screw cap
3. Capping head: 1 head
4. Main material: SUS304
–Suitable for sealing various of screw cap for plastic bottle. It’s with one capping head with capacity 1000-2000B/H.
–Adopts the high quality of stainless steel 304 material.
–Could be used single or connected with the filling line by conveyor belt, like bottle washing machine, bottle drink filling machine.
–Perfect in performance, reliable in operation and easy in maintenance. So it is widely used in automatic packing lines for various kinds of wine, drink, pharmacy chemicals, reagent, pesticide and so on .It is one of the most ideal screw type automatic sealing equipment.
-Adopts the high quality of stainless steel 304 material.
–Perfect in performance, reliable in operation and easy in maintenance.
Suitable for sealing various of screw cap for plastic bottle. It’s with one capping head with capacity 1000-2000B/H. it is widely used in automatic packing lines for various kinds of wine, drink, pharmacy chemicals, reagent, pesticide and so on .It is one of the most ideal screw type automatic sealing equipment.
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.
Fill in your details and we’ll get back to you in no time.