NEW CROWN

Carbonated Drink Bottle Filling Machine

soft drink machine is consisted of Washing,filling,capping part.Bottle Washing,filling,capping can be carried out on the same machine. The design of the machine is scientific and reasonable.It is a fully automatic and high efficiency carbonated drink filling machine.

Product Gallery

Product Video

Technical Specifications

ModelYFDY12-12-4YFDY18-18-6YFDY24-24-8YFDY32-32-10
ProductionB/H(600ml)3000-40005000-60007000-80008000-10000
Bottle standardNeck:φ50-100mmHeight150-320mm
Water pressure of washing bottle0.18-0.25Mpa
Water consumption for washing bottlekg/h500100015002000
Spraying position471014
Dripping bottle position35810
Filing precision+5MM
Gas source pressure0.4Mpa
Filling pressure0.4Mpa
Gas consumption(m⊃3;/min)0.30.40.50.7
Total powerkw4.24.556.2
Total weightkg22.534
Dimension L*W*H)mm2100*1700*21002500*1850*21002700*2200*21003500*2200*2100

Description

Product Description:

It has some features as following:The soft drink machine adopts advanced technology and NanJing valves, with high filling precision.The speed of filling is fast and the liquid amount is controlled accurately,with same filling level.

The soft drink machine is controlled by PLC with touch-screen as the interface between human and machine.The amount of the drinks in the drink tank can be controlled automatically.The filling and capping will be stopped automatically when there is no bottle.When bottles are cramped wrongly or caps are not available,the machine can be stopped automatically.

Advantages:

1. The 3 in 1 soft drink machine is mainly used in the beverage washing filling and capping machine operations. The three functions of bottle wash, fill and capping are composed in one body of the machine.

2. The appearance is beautiful and the function is complete. Its operation and maintenance is convenient. Its automation is high.

The advanced technology from Germany and Italy are employed. The speed of filling is fast and the liquid amount is controlled accurately. The filling device can be stopped automatically when there is no bottle or bottles are damaged. The advanced auto-washing technology is used in the system.

3. Pneumatic value and damped gears are used for bottle conveying, the noise is low and the whole machine runs smoothly.

The magnetic torque is used for screw capping.The power of screw capping can be adjusted without steps. The power of the screw capping can also be fixed. The capps can not be damaged, the capping is reliable.

4. Horizon swirl air power caps sorting device is used to avoid damaging the surface of caps, and when there is a shortage of caps in the caps storage tank, an alarm signal will be generated and the caps will be fed automatically.

5. The whole machine is controlled by PLC with touch-screen as the interface between human and machine.The amount of the drinks in the drink tank can be controlled automatically. The filling and capping will be stopped automaticlly when there is no bottle. When bottles are cramped wrongly or caps are not avaliable, the machine can be stopped automatocally.

Application

Carbonated Drink Bottle Filling Machine is consisted of Washing,filling,capping part.Bottle Washing,filling,capping can be carried out on the same machine.It’s producing all kinds of soda drink, carbonated drink contained with Glass bottle. The design of the machine is scientific and resonable.

 

Packing and delivery:

All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.

FAQ:

1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .

2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT

4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON

Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.

Request A Quote

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Keep in touch

Fill in your details and we’ll get back to you in no time.