soft drink/Beer pasteurizer tunnel is used for bottled/canned beer and soft drink pasteurizing.
Water pump | NANFANG |
---|---|
Temp sensor | JUMO |
Steam control valve | Spirax DN40 |
PLC | Siemens |
Approach switch | Autonics |
Photoelectric | Autonics |
PLC | Siemens S7-1500 with temperature control, water pump flow rate control |
Zone 1 | Zone 2 | Zone 3 | Zone 4 | Zone 5 | Zone 6 |
---|---|---|---|---|---|
1.3m,6.6min/22℃ | 1.3m,6.6min/38℃ | 2m,10min/67.5℃ | 2.2m,11min/63℃ | 1.3m,6.6min/37℃ | 1.3m,6.6min/21℃ |
water flow 25t/h, lift 18m | water flow 25t/h, lift 18m | water flow 50t/h, lift 18m | water flow 50t/h, lift 18m | water flow 25t/h, lift 18m | water flow 25t/h, lift 18m |
2, Easy construction for easy maintenance;
3, Speed adjustable;
4, Transparent glass window at entrance and end will make clear of view if any problem happening inside tunnel and open able top will help for easy problem solving;
5, the recycle water system will help for reducing water consumption;
6, engineering plastic chain can be both cold and heat resistant; it can prolong machine life time. Conveyor is by high intensity plastic chain belt, is with high intensity, acid resistant, rot resistant and abrasion resistant.
7, Spray angel can be 360°adjustable; spray to every position of bottles averagely, it will make full use of spray water and it will increase spray area. Spraying nozzles is from Spraying systems-USA,spray averagely;
8, Main motor is with overload protection, can protect conveyor and conveying devices safely. Main driver adopts stepless motor, conveyor speed is changed freely.
Capacity:5000-6000 CPH
Can inlet temp :5 deg C
Can outlet temp :25-30 deg C
Suggested temp zone qty:6
Motor Consumption:2.2KW
Pump consumption: 3KW*2 sets
2.2KW*4 set
Heat exchanger area:6m2*2 sets
Working area:15.98m2
Belt length:9.4m
Belt width:1.7m
Weight:1500kg
Steam consumption:350KG/H
Dimension:10000×2000×1700mm
The principle is: Conveyor brings bottles/cans into the cooling tunnel, there will be hot/cold water generated from side holding tanks to spray by spray nozzles on the top of tunnel onto passing bottles.
With heat exchange principle, the bottles/cans temperature will be bring up to high temperature to pasteurize the virus inside vessel, the bring down again by cold water to normal room temperature to keep longer shelf life.
Beer pasteurizer tunnel is used for bottled/canned beer pasteurizing.
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.
Fill in your details and we’ll get back to you in no time.