Plastic Bottle Juice Filling Machine is mainly designed for filling hot temperature liquid.
Model: | RCGF12-12-4 | RCGF18-18-6 | RCGF24-24-8 | RCGF32-32-10 | RCGF40-40-12 | RCGF50-50-15 | RCGF60-60-15 |
---|---|---|---|---|---|---|---|
Capacity: B/H (500ml) | 3000-4000 | 7000-8000 | 10000-12000 | 12000-15000 | 15000-18000 | 20000-22000 | 22000-25000 |
Bottle shape: | Normal round or square | ||||||
PET bottle: (mm) | (Bottle Diameter): φ50-φ110mm (Height): 150-310mm Volume: 250ml -2000ml |
||||||
Cap: | Plastic screw cap | ||||||
Filling precision: | ≤ ±5mm | ||||||
Return system | High position tank: 1 set; return tank: 1 set; vacuum pump: 1 set; booster pump: 1 set | ||||||
Material | Stainless steel 304; touch part: 316 | ||||||
Power(KW) | 3.0 | 4.0 | 4.2 | 5.2 | 6.2 | 7.5 | 8.5 |
Gas source pressure: | 6 bar | ||||||
Rinsing pressure: | 2-2.5 bar | ||||||
Overall size:(mm) | 1900*1500*2350 | 2250*1650*2350 | 2600*1965*2350 | 2980*2200*2250 | 3880*2200*2250 | 4000*2250*2250 | 5500*3500*2250 |
Weight: (KG) | 2500 | 3500 | 4500 | 6500 | 8500 | 9800 | 12000 |
PLC | Mitsubishi / Siemens |
---|---|
Touch screen | Mitsubishi / Siemens |
Contactor | Schneider |
Rely | Schneider |
Transducer | Shilin / Mitsubishi / Panasonic |
Light sensor | Autonics |
Power | Mingwei |
Pneumatic parts | Airtac / Festo |
Stainless steel | ZPSS |
Motor | Domestic brand / Siemens / ABB |
Bearing | Domestic brand / NSK |
Applications:
Plastic Bottle Juice Filling Machine is mainly designed for filling hot temperature liquid into PET bottle; For example juice, tea drinks etc which are made of concentrate juice.
Packaging & Delivery:
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.
FAQ:
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
Installation and maintenance:
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.
Fill in your details and we’ll get back to you in no time.